Average Costs of Construction

County   Average Costs $364,194.91   $116,233.33 1.13% 32.86% 0.09% 10.08% 0.30% 0.45% 0.21% 0.00% 0.42% 0.42% 1.65% 1.20% 0.11% 0.11% 0.10% 0.03% 1.43% 0.17% 0.09% 0.30% 0.27% 1.92% 0.08% 0.42% 0.92% 0.82% 1.74% 0.11% 0.88% 0.04% 0.11% 2.67% 0.01% 2.00% 2.23% 2.02% 1.76% 0.04% 0.63% 0.01% 0.30% 0.12% 0.21% 1.60% 0.66% 0.22% 0.51% 0.21% […]
Share

County
 
Average Costs
$364,194.91
 
$116,233.33
1.13%
32.86%
0.09%
10.08%
0.30%
0.45%
0.21%
0.00%
0.42%
0.42%
1.65%
1.20%
0.11%
0.11%
0.10%
0.03%
1.43%
0.17%
0.09%
0.30%
0.27%
1.92%
0.08%
0.42%
0.92%
0.82%
1.74%
0.11%
0.88%
0.04%
0.11%
2.67%
0.01%
2.00%
2.23%
2.02%
1.76%
0.04%
0.63%
0.01%
0.30%
0.12%
0.21%
1.60%
0.66%
0.22%
0.51%
0.21%
0.00%
0.59%
0.25%
1.00%
0.28%
0.80%
0.92%
1.47%
0.27%
2.38%
0.57%
2.09%
0.13%
0.72%
0.21%
1.05%
2.55%
0.39%
0.90%
0.04%
1.12%
0.55%
1.09%
0.54%
1.42%
0.23%
0.07%
0.13%
0.00%
0.47%
0.12%
0.00%
0.26%
0.95%
0.46%
0.19%
0.14%
0.30%
0.09%
0.02%
0.02%
0.22%
0.04%
0.32%
State
Construction Costs
 
Lot Value
Builder Profit
Log/Timberframe Package
Logs stacked to roof level
Dry-In
Arichitect, Engineering, Plans & Blueprints
Permits – City/County
Utility Connection Fees
Demolition
Clearing/Stakeout
Rough Grading/Shoring/Fill
Private Septic System
Domestic Water/Well
Pump House & Pressure Water System
Rock
Water Hookups
Sewer Hookups
Site Excavation
Ground Plumbing
Ground Mechanicals
Ground Electric
Underground Utilities
Foundation walls
Retaining walls
Concrete slab poured – garage
Concrete slab poured – house
Superior walls (precast)
Foundation complete
Structural Masonry
Rough framing materials
Structural steel
Mfg. floor trusses/components
Rough framing labor
Lightweight concrete interior floors
Rough HVAC
Rough electrical
Rough plumbing
Fireplaces including flues
Security and communications pre-wiring
Joist/SubFloor
Underlayment
Roof sheathing
Waterproofing
Gutters/downspouts/sheet metal
Roof Covering
Windows
Exterior doors
Exterior siding
Exterior trim
Stucco
Masonry veneer
Chimney
Garage
Garage doors
Exterior painting
Insulation
Drywall/plaster
Interior stairways
Cabinetry
Interior doors
Interior trim
Finish hardware
Countertops
Tubs/showers/enclosures
Interior painting and wall coverings
Hard surface finish – flooring
Carpeting
Appliances
Security system
Finish plumbing
Plumbing fixtures
Finish electrical
Lighting fixtures
Finish HVAC
Bath accessories
Tub and shower doors/mirrors
Finish grading
Pool/spa
Hardscape – driveway/walkway/steps
Landscaping
Fencing
Touch up – final clean up
Decks/porches
Final grading and seeding
Rental Equipment
Finish Basement Materials
Builder Contingency
Misc.
Exterior Sheathing
Temporary Utilities
Solar Panels
Radiant Heat
Footers
Search another county by returning to the Construction Costs main page
Comment Feed

One Response

  1. I am wondering if your total of 364,194 is the total including the lot, in other words do you deduct the 116,000 to get to the net costs?

    Janis KuykendallOctober 3, 2008 @ 9:29 am

Get your FREE Trial Issue of Log Home Living and 2 FREE gifts.
Yes! Please send me a FREE trial issue of Log Home Living and 2 FREE gifts.
If I like it and decide to continue, I'll get 8 more issues (9 in all) for just $15.95, a savings of 65%! If for any reason
I decide not to continue, I'll write "cancel" on the invoice and owe nothing. The FREE trial issue and 2 FREE gifts are mine to keep, no matter what.
Full Name:
Address 1:
Address 2:
City:
State:
Zip Code:
Email (req):
Offer valid in US only.
Click here for Canada or here for international subscriptions